Salt Shed – District 4

Neighborhood: Brighton

Description: PWD Bridges and Buildings Division was tasked with designing a salt shed for the District 4 yard in Brighton to protect the salt pile from the elements. PWD constructed a 70’x75’ salt shed at District 4 yard located on 315 Western Avenue.  The pre-engineered structure consisted of aluminum parts to prevent erosion and the structure was placed on top of a precast concrete blocks foundation.  The site work and foundation layout were performed by PWD Staff and the Structure was installed by WES Construction.

Project Status: Completed

Project Cost: $400,000

Project Completion: August, 2013

Project Team: 

  • Fouad Hamzeh, Project Manager, BPWD
  • FST, Design Consultant
  • WES Construction Co., Contractor